Street Works UK: Material Classification Protocol
The Environment Agency requires all excavated waste to be classified before disposal / treatment. Utilities have been able to do this in two ways previously: unplanned works followed RPS 211 and Planned works followed WM3. A solution was required to better deal with waste generated from unplanned works and the Environment Agency was open to … Continue reading Street Works UK: Material Classification Protocol
Copy and paste this URL into your WordPress site to embed
Copy and paste this code into your site to embed